Upgrade of Produced Water Disposal Facility at Qatif's GOSP-1

Client: Saudi Aramco
  • Lead Division:Mechanical Oil and Gas Division
  • Client:Saudi Aramco
  • Category:Mechanical
  • Location:KSA, Saudi Arabia
  • Start Year:2019
  • Project Status:Under Construction
  • Completion Year:2025
  • Project Duration23 Months

Installation of a water oil separation vessel; water disposal pumps; water injection pumps; low-pressure de-gassing tank water draw-off pumps and a pipeline to transfer oily water from Ju’aymah Terminal to Qatif’s GOSP-1.

Back to Projects