Das Facility Replacement – Critical Piping Systems EPC Work

Client: ADNOC Offshore
  • Lead Division:Mechanical Oil and Gas Division
  • Client:ADNOC Offshore
  • Category:Mechanical
  • Location:Das Island, Abu Dhabi
  • Start Year:2023
  • Project Status:Under Construction
  • Completion Year:2026

Replace Piping systems with zero shutdown or minimum shutdown with optimum Flaring Optimize the new network and piping routing considering the future production

Back to Projects