Reduce Sales Gas Water Content at Uthmaniyah Gas Plant and Shedgum Gas Plant

Client: Saudi Aramco
  • Lead Division:Mechanical Oil and Gas Division
  • Client:Saudi Aramco
  • Location:KSA, Saudi Arabia
  • Start Year:2014
  • Project Status:Completed
  • Completion Year:2018

Addition of gas cooling and propane chilling system upstream of the existing TEG gas dehydration process at UGP to lower the sweet gas temperature from 139 Deg.  F. to 80 Deg. F. 

Back to Projects