General construction and expansion of the existing Bu Hasa oil pad hubs, the gas lift phase II and the produced water re-injection phase I and II. The purpose of the project is to increase and sustain the Bu Hasa production plateau output to 650,000 barrels per day by October 2021
Back to Projects