Replace 4.16KV Motor Control Gear at Shedgum and Uthmaniyah

Client: Saudi Aramco
  • Lead Division:Electrical Division
  • Client:Saudi Aramco
  • Location:Saudi, Saudi Arabia
  • Start Year:2014
  • Project Status:Completed
  • Completion Year:2017

Engineering, design, construction and commissioning of replacement 4.16KV motor control gear at Uthmaniyah and Shedgum gas plant.

Back to Projects