Upgrade Gas Compression Plant Power Distribution at Tanajib

Client: Saudi Aramco
  • Lead Division:Electrical Division
  • Client:Saudi Aramco
  • Location:Saudi, Saudi Arabia
  • Start Year:2014
  • Project Status:Completed
  • Completion Year:2017

Replacement of six existing transformers to higher MVA ratings captive transformers with dual secondary voltages 34.5/6.9-13.8kV with protection devices to resolve a voltage drop problem.

Back to Projects