Bu Hasa Integrated Field Development Project

Client: ADNOC Onshore/ TR
  • Lead Division:Mechanical Oil and Gas Division
  • Client:ADNOC Onshore/ TR
  • Category:Mechanical, Electrical, Civil
  • Location:Bu Hasa, Abu Dhabi, Abu Dhabi
  • Project Status:Under Construction
  • Project Duration30 Months

General construction and expansion of the existing Bu Hasa oil pad hubs, the gas lift phase II and the produced water re-injection phase I and II. The purpose of the project is to increase and sustain the Bu Hasa production plateau output to 650,000 barrels per day by October 2021

Back to Projects